Deep foundation inspection · pile testing

Deep Foundation Inspection, Pile Monitoring and Pile Load Testing

Driven piles, drilled shafts, auger cast piles, helical piles, and micropiles are buried the day they are built. We put an inspector at the rig for every element the specification calls for, run the load and integrity tests that prove capacity, and hand the engineer of record a pile record package they can accept.

Foundation types
Driven, drilled, auger cast, helical, micropile
Code basis
IBC Sections 1705.7, 1705.8 and 1705.9 special inspection
Records
Same-day field reports; final pile record package for the engineer of record
Dispatched from
Sugar Land, TX headquarters · 27 regional hubs
Deep foundation services
Pile Installation Monitoring
Drilled Shaft & Auger Cast Pile Inspection
Pile QA/QC Programs
Static Pile Load Testing
Dynamic Pile Testing (PDA)
Pile Integrity Testing (PIT, CSL, TIP)
Load tests
Static compression · tension · lateral · bi-directional · high-strain dynamic
Call us
(346) 420-5425

What we inspect and test

Pile monitoring, pile QA/QC and pile load testing

Six services, one field team and one set of records. Each page below explains what is inspected or tested, what you receive, and who buys it.

Pile Installation Monitoring

Driven, helical and micropile installation monitoring: hammer checks, blow counts, tip elevations, splices, driving criteria. IBC 1705.7 special inspection.

Covers: Steel H-piles, pipe piles, precast concrete piles, timber piles, helical piles, micropiles

Scope, standards, deliverables →

Drilled Shaft & Auger Cast Pile Inspection

Drilled shaft, drilled pier and auger cast pile inspection: depth, bearing stratum, bottom cleanliness, slurry, cage, grout volume, concrete placement. IBC 1705.8.

Covers: Drilled shafts and piers (dry, cased, slurry), auger cast-in-place piles, drilled displacement piles

Scope, standards, deliverables →

Pile QA/QC Programs

Pile QA/QC for owners and contractors: inspection and test plans, material verification, hold points, nonconformance control, final pile record packages.

Covers: Driven, drilled, auger cast, helical and micropile foundations

Scope, standards, deliverables →

Static Pile Load Testing

Static pile load test monitoring and reporting: axial compression (ASTM D1143), tension (D3689), lateral (D3966), bi-directional (D8169). Houston and nationwide.

Test types: Axial compression, axial tension, lateral, bi-directional static

Scope, standards, deliverables →

Dynamic Pile Testing (PDA)

High-strain dynamic pile testing (ASTM D4945) during driving and restrike: capacity, driving stresses, hammer performance, pile integrity. Signal matching available.

Measures: Force and velocity at the pile head on each blow

Scope, standards, deliverables →

Pile Integrity Testing (PIT, CSL, TIP)

Pile and drilled shaft integrity testing: low-strain PIT (ASTM D5882), crosshole sonic logging (D6760), thermal integrity profiling (D7949). Houston, nationwide.

Methods: Low-strain impact (PIT), crosshole sonic logging (CSL), thermal integrity profiling (TIP)

Scope, standards, deliverables →

How a pile program runs

Five steps from pile schedule to accepted foundation

  1. 01

    Review the plans, specs and inspection and test plan

    Before mobilization we read the geotechnical report, foundation plan, pile schedule, specification section, and the statement of special inspections, and agree the hold points: indicator piles, test piles, load tests, and the acceptance criteria each one is judged against.

  2. 02

    Pre-installation meeting

    Inspector, contractor, and engineer of record walk through the installation plan, hammer or rig submittal, driving or drilling criteria, splice and cage details, and who calls a stop when a pile falls outside criteria.

  3. 03

    Witness every pile at the hold points

    Our inspector is at the rig for each element the specification calls for: driving records, shaft excavation and bottom checks, cage placement, grout or concrete placement, and every load and integrity test.

  4. 04

    Same-day field reports with photos

    Pile logs, test readings, and nonconformances go to the contractor and engineer the day they are recorded, so a short pile, a soft bottom, or a low grout volume is decided while the rig is still on the element.

  5. 05

    Final pile record package

    As-installed pile records, test reports, material certifications, and the nonconformance log closed out, organized for the engineer of record's acceptance and the building official's file.

Foundation types

Every common deep foundation element

  • Steel H-piles and pipe piles
  • Precast and prestressed concrete piles
  • Timber piles
  • Drilled shafts and drilled piers, dry, cased, or slurry
  • Auger cast-in-place and drilled displacement piles
  • Helical piles and micropiles

One team for the whole foundation

Inspection, testing and the laboratory together

The inspector logging the pile, the technician testing the concrete or grout, and the laboratory breaking the cylinders and cubes work under one quality system. Pile records, test results, and nonconformances land in one report set instead of three firms' paperwork for the engineer to reconcile.

Construction materials testingGeotechnical engineering

Standards

Deep foundation inspection and pile testing standards

StandardCoversUsed for
IBC Section 1705.7Driven deep foundation elementsSpecial inspection of pile driving
IBC Section 1705.8Cast-in-place deep foundation elementsDrilled shafts, auger cast piles
IBC Section 1705.9Helical pile foundationsInstallation and torque records
ASTM D1143/D1143MStatic axial compressive loadCompression load test
ASTM D3689/D3689MStatic axial tensile loadUplift and tension load test
ASTM D3966/D3966MLateral loadLateral load test
ASTM D8169/D8169MBi-directional static axial compressive loadEmbedded-jack load test
ASTM D4945High-strain dynamic testingDynamic testing during driving and restrike
ASTM D7383Axial compressive force pulse (rapid) loadRapid load test
ASTM D5882Low-strain impact integrity testingPile integrity screening
ASTM D6760Ultrasonic crosshole integrity testingCrosshole sonic logging
ASTM D7949Thermal integrity profilingDrilled shaft and ACIP integrity

Coverage

Deep foundation inspection in Houston, Texas and 27 US hubs

Inspectors are dispatched from our Sugar Land, Texas headquarters across the Houston metro and the Gulf Coast, and staffed through regional hubs for projects elsewhere.

Houston, TXDallas, TXAustin, TXPhoenix, AZAtlanta, GADenver, COWashington, DCCharleston, WVCharlotte, NCRaleigh, NCChicago, ILOrlando, FLTampa, FLMiami, FLNashville, TNSeattle, WALas Vegas, NVLos Angeles, CASacramento, CANew York, NYPhiladelphia, PABoston, MAMinneapolis, MNSalt Lake City, UTKansas City, MOColumbus, OHDetroit, MI

Find your nearest hub

FAQ

Deep foundation inspection and pile testing FAQ

Is deep foundation inspection a required special inspection?

Yes, on projects under the International Building Code. Section 1705.7 covers driven deep foundation elements, Section 1705.8 covers cast-in-place deep foundation elements such as drilled shafts and auger cast piles, and Section 1705.9 covers helical piles. The statement of special inspections for the project lists which tasks are continuous and which are periodic, and the building official expects the special inspector's records before the foundation is accepted.

What is the difference between pile monitoring and pile load testing?

Monitoring is the record of how each pile was installed: hammer, blow counts, tip elevation, shaft depth and diameter, grout or concrete volume. A load test measures how much load a pile actually carries. Most projects need both: load tests on a few piles set or confirm the installation criteria, and monitoring proves every production pile met them.

Static or dynamic load test: which one does my project need?

The geotechnical engineer of record and the specification decide. A static load test is the reference method and is slower and more expensive per pile. High-strain dynamic testing is faster, can be run on many piles during driving or restrike, and is usually calibrated to the site with signal-matching analysis or a static test. We run whichever the specification calls for and can help the design team compare options before bid.

Do you inspect auger cast piles and drilled shafts as well as driven piles?

Yes. Auger cast pile inspection centers on grout volume versus depth and grout strength; drilled shaft inspection centers on excavation depth, bearing stratum, bottom cleanliness, slurry properties, cage placement, and concrete placement by tremie or pump. Each has its own page below.

Do you supply the reaction system for a static load test?

Yes. We run the whole test: the reaction system, test beam, and jack, the instrumentation, load and movement readings at each increment, and the test report for the engineer of record. Where the specification has the foundation contractor install reaction piles, we coordinate their layout before installation.

How fast do we get pile records?

Field records and any nonconformance go out the same day they are recorded. Load test and integrity test reports follow once readings are reduced and reviewed; the quote states the turnaround for each test type.

Scheduling & proposals

Need deep foundation inspection?

Call to schedule a technician, or send project documents for a written proposal.

Talk to us

Questions about a project? Send a note.

Nothing here is required — leave a phone number or an email and we'll get back to you. For a written scope, the proposal request form takes plans and specs.

Or call (346) 420-5425 · info@constructionmaterialtesting.com