Cast-in-place deep foundation inspection
Drilled Shaft, Drilled Pier and Auger Cast Pile Inspection
A drilled shaft or auger cast pile is only as good as the hole it was built in and the concrete or grout that filled it. We inspect the excavation, the cage, and the placement, and record the numbers that prove the element is the one the engineer designed.
- Covers
- Drilled shafts and piers (dry, cased, slurry), auger cast-in-place piles, drilled displacement piles
- Checked against
- Foundation plan, shaft schedule, geotechnical report, specification tolerances
- Deliverable
- Shaft and pile logs, grout or concrete volume records, test results, nonconformance log
- Code basis
- IBC Section 1705.8
- Standards
- IBC 1705.8 · ASTM C31 / C39 · ASTM C109 (grout cubes) · ASTM C143 / C1064
- Dispatched from
- Sugar Land, TX headquarters · 27 regional hubs
- Often paired with
- Pile Integrity Testing (PIT, CSL, TIP)
Pile QA/QC Programs
Static Pile Load Testing
All deep foundation services - Call us
- (346) 420-5425
Drilled shaft and drilled pier inspection
We verify location, diameter, plumbness, and depth; confirm the bearing stratum against the geotechnical report and log the soils or rock encountered; check bell dimensions where specified; and check the bottom for loose material and water before the cage goes in.
On slurry shafts we test slurry before concrete placement for the properties the specification sets, typically density, viscosity, sand content, and pH. We check the reinforcing cage for bar size, spacing, splices, spacers, and length, and watch it set to the right elevation.
During concrete placement we test concrete at the truck, record tremie or pump placement and the tremie embedment, and compare the volume placed with the theoretical volume of the shaft. A large overrun or shortfall is reported before the next shaft is drilled.
Auger cast pile inspection
On an auger cast pile the grout is the pile, so the record that matters is grout volume against depth. We record auger depth, grout pressure, and the volume pumped as the auger is withdrawn, from the rig's automated monitoring output where the specification requires it, and compare it with the minimum volume factor in the specification.
We cast grout cubes for compressive strength, check reinforcing cage or center bar placement into fresh grout, and record cutoff elevations.
- Grout volume versus depth for every pile, flagged when it drops below the specified factor
- Grout cube sampling and laboratory compressive strength testing
- Cage and center bar placement depth recorded
- Pile location, diameter, and depth checked against the plan
What you receive
Deliverables
- Drilled shaft log: depth, diameter, soils encountered, bearing stratum, bottom check
- Slurry test records where slurry is used
- Cage inspection record
- Concrete or grout volume record against theoretical volume
- Concrete cylinder and grout cube results
- Daily field report and nonconformance log
Who buys it
Built for
- Commercial, data center, and industrial projects on drilled piers
- Bridge and transportation projects with drilled shafts
- Auger cast pile projects for warehouses, tanks, and equipment foundations
- Geotechnical engineers of record who need excavation records against their design
Related CMT services
FAQ
Drilled Shaft & Auger Cast Pile Inspection: questions buyers ask
Who confirms the bearing stratum in a drilled shaft?
The geotechnical engineer of record sets the bearing criteria. Our inspector logs the material encountered and the depth it was reached and compares it with the report; where the criteria call for the engineer's direct confirmation, we hold the shaft until the engineer has seen it.
Do you test the concrete and grout as well?
Yes. Our technicians run slump, temperature, and air on drilled shaft concrete, cast cylinders, and cast grout cubes for auger cast piles. Strength testing is done in our laboratory and reported against the specified strength.