Deep foundation integrity testing
Pile and Drilled Shaft Integrity Testing
Integrity testing looks inside a concrete pile or drilled shaft after it is built for the defects no one could see during concrete placement: necking, soil inclusions, voids, poor concrete at the toe, or a cage pushed off center.
- Methods
- Low-strain impact (PIT), crosshole sonic logging (CSL), thermal integrity profiling (TIP)
- Applies to
- Drilled shafts, auger cast piles, precast and cast-in-place concrete piles
- Needs
- CSL and TIP need access tubes or sensors tied to the cage before concrete placement
- Performed by
- CSL and TIP through our qualified testing partners, coordinated and reported by our team
- Deliverable
- Per-element integrity report with anomalies located by depth
- Standards
- ASTM D5882 · ASTM D6760 · ASTM D7949
- Dispatched from
- Sugar Land, TX headquarters · 27 regional hubs
- Often paired with
- Drilled Shaft & Auger Cast Pile Inspection
Pile QA/QC Programs
Dynamic Pile Testing (PDA)
All deep foundation services - Call us
- (346) 420-5425
Choosing the method
Each method sees something different, and the choice has to be made before concrete placement for two of them.
- Low-strain impact (PIT), ASTM D5882: a small hammer tap on the pile head; fast, cheap, no preparation, best on shorter piles and for screening many elements
- Crosshole sonic logging (CSL), ASTM D6760: ultrasonic signals between access tubes tied to the cage; looks at concrete quality between the tubes along the full length
- Thermal integrity profiling (TIP), ASTM D7949: measures the heat of curing concrete along the cage; shows concrete cover and the effective shape of the shaft, including outside the cage
Planning for CSL and TIP
Access tubes or thermal sensors have to be on the cage before it is set, the right number for the shaft diameter, capped, and filled with water where required. We review the tube or sensor layout with the contractor before the first cage is built, so the test is possible when the shaft is ready.
CSL and TIP testing is performed by our qualified testing partners. We schedule the testing against concrete age, coordinate access with the contractor, and fold the results into the same pile record as the installation logs.
When an anomaly is found
We report the depth and extent of the anomaly and compare it with the installation record from the shaft or pile log. The engineer of record decides whether further investigation such as coring, additional testing, or repair is needed.
What you receive
Deliverables
- Access tube or sensor layout review before cage construction
- Field test records for each element
- Integrity report with anomalies located by depth
Who buys it
Built for
- Bridge and transportation drilled shaft projects that require CSL
- Building and industrial projects screening auger cast piles with PIT
- Engineers investigating a suspect pile or shaft
Related CMT services
FAQ
Pile Integrity Testing (PIT, CSL, TIP): questions buyers ask
How long after concrete placement can integrity tests be run?
TIP is run while the concrete is curing, usually within the first one to two days. CSL and PIT need the concrete to gain strength first and are typically run several days after placement; the specification sets the minimum age.
Can you test a pile that has no access tubes?
Low-strain testing needs no tubes and can be run on most existing concrete piles with an accessible head. CSL and TIP cannot be added after the fact.