Home / Services / Deep Foundations / Dynamic testing
High-strain dynamic pile testing
Dynamic Pile Testing (High-Strain, ASTM D4945)
Strain gauges and accelerometers bolted to the pile measure every hammer blow. From those signals we estimate pile capacity, check driving stresses, confirm the hammer is delivering the energy it should, and spot damage before the pile is cut off.
- Measures
- Force and velocity at the pile head on each blow
- Reports
- Estimated capacity, driving stresses, transferred energy, integrity
- When
- During initial driving, at restrike after setup, or on drop-weight tests of cast-in-place piles
- Analysis
- Signal matching on selected blows, reviewed by a licensed engineer
- Standards
- ASTM D4945 · ASTM D7383 (rapid load)
- Dispatched from
- Sugar Land, TX headquarters · 27 regional hubs
- Often paired with
- Pile Installation Monitoring
Static Pile Load Testing
Pile Integrity Testing (PIT, CSL, TIP)
All deep foundation services - Call us
- (346) 420-5425
What dynamic testing tells you
During driving, dynamic testing reports the energy reaching the pile, compression and tension stresses against the pile's allowable driving stresses, and changes in the signal that point to damage. At the end of driving and at restrike it gives an estimate of static capacity, which signal-matching analysis refines into shaft and toe resistance.
Because it can be run on many piles, dynamic testing is the usual way to extend a few static tests across a whole site and to set or verify driving criteria.
- Hammer performance and transferred energy checked against the submittal
- Driving stresses kept inside allowable limits for steel, concrete, and timber piles
- Restrike testing to measure soil setup after a waiting period
- Drop-weight dynamic tests on drilled shafts and auger cast piles where specified
Dynamic testing and installation monitoring together
On driven pile jobs we pair dynamic testing with full-time installation monitoring, so test results and driving records sit on the same pile log and the engineer can adjust criteria without waiting on two firms.
What you receive
Deliverables
- Field results for each tested blow: energy, stresses, estimated capacity
- Signal-matching analysis on selected blows where specified
- Dynamic testing report for the engineer of record
Who buys it
Built for
- Driven pile projects that use dynamic testing to set driving criteria
- Owners and engineers extending static test results across a site
- Bridge, marine, and industrial foundations with high pile counts
Related CMT services
FAQ
Dynamic Pile Testing (PDA): questions buyers ask
Can dynamic testing replace a static load test?
Sometimes. Codes and specifications often accept dynamic testing with signal matching in place of, or alongside, a static test. The engineer of record decides; the common approach is a small number of static tests to calibrate dynamic testing on the rest.
Why test at restrike?
Many soils gain strength after driving, and some lose it. A restrike a day or more after initial driving measures the capacity the pile will actually have in service.
Scheduling & proposals
Need dynamic testing?
Call to schedule a technician, or send project documents for a written proposal.