Boundary, topographic, and construction staking surveys that put the design on the ground accurately the first time.

  • Boundary and title surveys for acquisition and permitting
  • Topographic surveys for civil design
  • Construction staking: building corners, utilities, paving, and grades
  • As-built surveys for closeout and conveyance

Questions we get

What is the difference between a boundary and a topographic survey?

A boundary survey establishes legal property lines and corners; a topographic survey maps existing grades and features inside them. Most development projects need both, and they are cheaper ordered together.

How far in advance should construction staking be scheduled?

Two to three business days of notice is typical for staking mobilizations; large or phased sites are scheduled as standing weekly visits.

What is an ALTA/NSPS land title survey?

A boundary survey performed to the ALTA/NSPS Minimum Standard Detail Requirements, which lenders and title companies require on most commercial real estate transactions. It shows boundaries, easements and encumbrances from the title commitment, improvements, encroachments, and the optional Table A items the client selects, such as utilities, flood zone, and parking counts.

What does construction staking include?

Setting control points and offset stakes from the approved plans so the contractor can build to line and grade: building corners and gridlines, curb and pavement, utilities and structures, and finished-floor and pad elevations. As-built surveys at the end verify what was built against the design and are often required for utility acceptance and project closeout.

Who signs the survey?

A professional land surveyor licensed in the project's state — in Texas, a Registered Professional Land Surveyor (RPLS). Survey services are delivered with licensed surveyors coordinated under one proposal and one point of contact with the testing and inspection work on the same project.

Do I need a topographic survey before the geotechnical investigation?

Not necessarily, but it helps. Boring locations are laid out from the site plan, and a current topographic survey lets the geotechnical engineer reference boring elevations to the proposed finished grades so cut and fill depths in the report are right. Scheduling the two together avoids a second mobilization.

Scheduling & proposals

Need land surveying?

Call to schedule a technician, or send project documents for a written proposal.

Talk to us

Questions about a project? Send a note.

Nothing here is required — leave a phone number or an email and we'll get back to you. For a written scope, the proposal request form takes plans and specs.

Or call (346) 420-5425 · info@constructionmaterialtesting.com