Home / Services / Environmental / Jackson, MS

Jackson, Mississippi

Environmental Services in Jackson, MS

Environmental site assessments and construction-phase environmental support that keep transactions and projects moving without surprises. Jackson and the surrounding MS area is covered on a project basis through our Nashville, TN regional hub.

Lead time
Set in the proposal, with mobilization planned around your pour and earthwork schedule
Laboratory
Sugar Land, TX laboratory under chain of custody, or a mobile laboratory for large projects
Reporting
Reviewed and issued under a documented quality system; formatted for owner, engineer, and building-official review
Serving
Jackson and the surrounding MS area — Baton Rouge, Birmingham
Coverage
Mississippi statewide · 27 regional hubs
Technicians
ACI- and NICET-certified field staff; licensed professionals in Mississippi
Call us
(346) 420-5425

Scope

Environmental services in Jackson

  • Phase I Environmental Site Assessments for acquisitions and refinancing
  • Phase II subsurface sampling when a Phase I identifies recognized environmental conditions
  • Construction stormwater support: SWPPP compliance inspections
  • Soil management screening for export and import of fill material

Full scope, standards list, and pricing basis: Environmental Services.

Local conditions

Environmental conditions in Jackson

Mississippi's history of industrial activity, agricultural chemical use, and aging petroleum infrastructure means environmental due diligence is not a formality — it is a practical necessity on a wide range of Jackson-area transactions and development projects. Brownfield redevelopment along former rail and industrial corridors, infill construction in established commercial zones, and federally financed projects in the region all carry environmental obligations that must be resolved before financing closes or ground breaks. Our firm provides Phase I and Phase II Environmental Site Assessments, construction-phase soil and groundwater monitoring, and regulatory-support documentation sized to your project's scope and schedule. Coverage in Jackson is dispatched through our Nashville regional hub, so scheduling should be arranged in advance to align with your project timeline. Work is performed under a documented quality system, and field staff hold applicable professional certifications. Whether you are a developer clearing title, a contractor managing disturbed soils, or an engineer supporting MDEQ coordination, we provide findings you can act on.

The Jackson metro sits within a region where shallow soils can include clay-rich alluvial and residual profiles with low permeability — a characteristic that affects how released petroleum or agricultural chemicals migrate and how intrusive Phase II sampling is designed. Mississippi's warm, humid climate also means surface staining, vegetation stress, and other recognized environmental conditions may be partially obscured by rapid vegetative growth, making thorough site reconnaissance timing an important scheduling consideration.

FAQ · Jackson

Our Jackson site was previously used for agriculture. Does pesticide or herbicide impact change how a Phase II is scoped?

Yes. Agricultural chemical use is a recognized environmental condition that warrants targeted soil sampling beyond a standard petroleum-focused Phase II scope. Sampling locations, depths, and the analyte list — typically organochlorine pesticides, herbicides, or specific compounds tied to known historic crops — are selected based on historical use documented during the Phase I. Laboratory analysis is performed under our documented quality system.

How does Mississippi's clay-heavy soil profile affect vapor intrusion evaluation on a Jackson redevelopment site?

Low-permeability clay layers can restrict vertical vapor migration, but they do not eliminate the pathway — lateral migration and preferential pathways through utilities or sandy lenses still warrant evaluation. Vapor intrusion assessment follows EPA guidance and is coordinated with any subsurface investigation. Soil classification during drilling references ASTM D2487, which informs both the conceptual site model and the sampling design.

We are developing a site near a former dry cleaner in Jackson. What specific contaminants should we expect to investigate?

Dry-cleaning operations historically used chlorinated solvents, primarily tetrachloroethylene (PCE) and its degradation products trichloroethylene (TCE), dichloroethylene, and vinyl chloride. Phase II scope would include soil and groundwater sampling analyzed for volatile organic compounds per EPA Method TO or equivalent. MDEQ's voluntary cleanup or No Further Action process may apply depending on findings and intended end use.

Which office covers environmental in Jackson, MS?

Field work in Jackson is dispatched through the Nashville, TN regional hub, about 330 miles away. Laboratory testing is performed in Sugar Land, TX under chain of custody, or in a mobile laboratory mobilized to large Jackson projects.

Are the technicians you send to Jackson certified?

Field sampling and testing in Jackson are performed by our ACI- and NICET-certified technicians. Environmental engineering and professional services are delivered with professionals licensed in Mississippi, coordinated under one proposal.

Hiring for project coverage. Field technician openings in Jackson · all positions.

Scheduling & proposals

Need environmental services in Jackson?

Call to schedule a technician, or send project documents for a written proposal.

Talk to us

Questions about a project? Send a note.

Nothing here is required — leave a phone number or an email and we'll get back to you. For a written scope, the proposal request form takes plans and specs.

Or call (346) 420-5425 · info@constructionmaterialtesting.com